Our Guarantee to Quality Assurance is
Our Installation Specifications
- Duct Board Plenums - Shall use only approved duct board start collars.
- All duct board and metal plenums shall use minimum:
- 4" depth - start collars 5" - 9"
- 8" depth - start collars 10" - 20"
- All duct board and metal start collars shall be sealed to plenum with approved duct seal mastic.
- All Start Collars - Shall have flex duct attached as follows:
- Minimum of 2 full wraps of approved duct tape to the inner-liner.
- Tie-wrap installed over tape and duct liner tightened with Malco or similar tension tool.
- Outer jacket with duct insulation over collar with secured tie-wrap or approved duct tape.
- Plenums/Coils - Shall be air sealed to the air handler with approved seal, screws, approved metal tape, duct sealer, etc.
- T-Y's
- Shall have minimum of 4" throat at all connecting points.
- All flex duct shall be sealed to Y's as per same start collars.
- Two wraps approved duct tape to inner-liner.
- Tie-wrap over duct tape tightened with Malco or similar tension tool.
- Outer jacket pulled over complete branch with insulation and secured with tie-wrap or approved tape.
- All T-Y's 10" and larger shall be 28 gauge minimum.
- All to be sealed at connecting points to prevent duct leakage.
- Pants Y's
- All pants Y's 10" shall be 28 gauge minimum
- Shall have minimum of 4" throat at all connecting points.
- All to be sealed as T-Y's with approved duct tapes - tie wraps.
- Return Air - Minimum 60 square inches per ton required. Return Air: 2 story homes shall have a minimum of 2 each return air grills for one system. The location shall be 1 each lower level and 1 each upper level. The upper level return is to eliminate stacking of hot air. Note: With a 2 system home an additional return air grill is required for the upper level system.
Return air shall be ducted if at all possible.
- If duct cannot be installed the chase area shall be fully drywalled, metal or duct board lined.
- The return air chamber shall be completely sealed, no leakage. Drywall tapes and mud or duct board tapes and air seal at all joints.
- Metal Return Air - All metal flat stock over plates or floor sheeting shall be sealed with duct sealer on bottom and top to prevent air leakage.
- Metal Start Collar - Attached to metal flat stock shall be a minimum of 6" in height for proper flex duct seal. Note: Proper flex duct installation to collar.
- Flex Duct Strapping - All duct shall be strapped with a minimum of 1-1/2 times wrap of approved minimum width strapping (1-1/2"). Duct strapping shall follow per manufacturer's installation instructions.
- Flex Duct
- Shall not be crushed or smashed to fit into a space that alters its shape.
- Radius at center line shall not be less than one duct diameter.
- Horizontal Air Handler
- All horizontal air handlers shall be raised a minimum of 3" off the platform.
- Shall be secured to platform with minimum 1-1/2" 26 gauge strap or equal.
- Shall have minimum 30" clearance in front of air handler.
- Air Handlers Return Air Plenum - Shall not be less than 4" in height to insure proper air return to blower motor.
- Horizontal Evaporator - All shall have an additional external safety drain pan tied into secondary drain.
- Registers - Minimum type shall be stamped 3 way with damper. It is suggested that open bar be used in 12x6 - 14x8 areas to insure maximum air coverage.
- Condensing Units
- Shall be attached to the plastic pad with truss clips or equal.
- Shall be started per manufacturers recommendations. Super heat or approach method only.
(Not 65 lbs suction, beer can cold)
|
|
 |